Hi, can someone please point me in the right direction?
I have installed a number of Shelly Pro devices and find the same problem in each case.
For many reasons, we get power loss. What I tend to find is that the Shelly does not set the output according to the schedule, if the power loss occurs during the time that an action should be performed.
For example: If a Shelly's output is in the off state and there is a power loss. An action occures during the power loss which should put the output into an On state but doesn't because the power is out.
The power then comes back on but the Shelly does not switch the output because it doesn't check what the state SHOULD be at the time.
i.e. It does not check the last action in the schedule list to see what the current state SHOULD be.
Is there a way to set this?
Thanks
Matthew