Beiträge von Harry Plotter

    Hello,

    It would be nice to have the ability to run a script on a schedule. Right now from the UI we can only control the output.

    I have a use case that needs to run a script on specific times of a day. Particularly the device needs to control some bells in a production facility for shift start, shift end, lunch break start and lunch break end. All those have different timings and number of "rings". So the best solution would be to enable the end user to control which script will run on different scheduled times.

    Hello,

    I have an PRO 4PM and on the same phase there is an water pump for the gardening. Both devices are not connected to each other they only share the same phase. The problem is that when the pump gets switched on, it draws so much power that I get an undervoltage, then when the pump is switched off, the PRO 4PM does not recover and the device needs reboot. I had set the undervoltage to 190V and have checked the box for the recovery

    Hello,

    I have an Pro 4pm and it is connected on channel 11 of my wifi AP. The AP is about 5 meters from the Pro 4pm and device is in a plastic box.

    I have created a script to scan bluetooth and whenever it finds my bluetooth device, it turns on the lights. I have noticed that whenever I start the bluetooth scan (active or not) I get packet losses on the wifi side. If I disable the scan, everything works fine.

    Anyone else have similar issue or could point out to the right direction?